Ups Zeytinburnu Headquarters Additional Building

Performance analysis was conducted based on obtained results of load bearing system survey and identification of material characteristics. Strengthening design was developed for identified weak points. Consultancy services were provided to the Customer at the tender stage, and subsequently, at the stage of actual construction works. The scope of OTS services included provision of correct field application of the design on behalf of the Customer, approving/disapproving the use of materials based on results of tests, provision of the schedule and filed application progress, control of interim progress, provision of solutions to details coming up on-site, accepting completed work or identifying defects on behalf of the Customer.

YEAR OF CONSTRUCTION

2012-2013

CUSTOMER

UGL

LOCATION

ZEYTINBURNU/ISTANBUL